Below is one of the Handouts from Forum #2 that Get Moving OC hosted. Notice the CHALLENGES and COSTS associated with Option #9:

  1. TRAFFIC RELIEF – Only moderate regional north-south traffic relief
  2. COMMUNITY OPPOSITION – (from LR, RMV, and SJC)
  3. EMINENT DOMAIN – Will require eminent domain to acquire necessary right of way
  4. HIGH IMPACT – High impact to built and natural environment, right-of-way, and utilities
  5. REGULATORY PERMIT – Moderately difficult to obtain regulatory permit
  6. HIGH COST – Projected cost greater than $600 million
  7. NO FUNDING – No identified source of funding

 

 

Below is one of the graphs shown in the SmithJohnson Survey. Note that the Beltway is the LEAST desirable option.